HighStep Systems wins contract for 50 Hertz transmission

Parchim Süd – Perleberg section in Mecklenburg-Western Pomerania


22 new pylons for the 65 kV line will be erected over a length of 380 kilometers between the Parchim Süd substation and Perleberg. The HighStep rail is installed in the middle of the mast wall and will enable the masts to be lowered with the HighStep lift in the future.

The installation can be carried out in one day with a team of 4-5 fitters. The HighStep rail is connected to the masts on average every 3 meters and is maintenance-free once properly installed.