Cable C1 – HighStep Systems secures the new urban artery of Paris

Home » Cable C1 – HighStep Systems secures the new urban artery of Paris

Project environment: Breaking new ground in France

The cable car "Cable C1“ It is far more than just a means of transport; it is the answer to a long-standing mobility challenge in the south of Paris. In the Ile-de-FranceVal-de-Marne, the most populous region of France, had long suffered from overburdened roads and an infrastructure that could no longer cope with rapid population growth.

The C1 closes this gap by extending the public transport system to a new, independent level ("Level +1"). It extends the Metro line 8 from Créteil Pointe du Lac and connects the municipalities of Limeil-Brévannes, Valenton and Villeneuve-Saint-Georges.

  • Route: 4,5 km

  • Stations: 5

  • travel time: Only 18 minutes (instead of unpredictable times in traffic jams)

Cable C1 Highstep Systems
@Ile-de-France Mobilités / Double France.

 

Around reliable, smooth ride To ensure the long-term decarbonization of transport, the infrastructure – especially the cable car pylons – must meet the highest safety and maintenance standards. This is where HighStep Systems in the game.


The challenge: security in densely populated areas

Since the Câble C1 runs directly through densely populated, urban areas, the planners faced specific challenges regarding the cable car towers:

  1. High risk of abuse: In busy urban areas, there is a high risk that unauthorized persons (urban climbers, vandals, playing children) will attempt to climb the poles. Conventional ladders would pose a fatal safety risk here.

  2. Availability: The C1 replaces bus lines and, as part of the public transport system, must be extremely reliable. Maintenance work must therefore be carried out quickly and ergonomically to minimize downtime.


The solution: HighStep Rail & Lift

HighStep Systems equipped the Câble C1 towers with an access system that combines security and efficiency:

1. Consistent protection against abuse (anti-climb)

This is the decisive factor, especially in the urban area from Créteil to Villeneuve-Saint-Georges.

  • No access for unauthorized persons: The one mounted on the tower HighStep Rail It is a smooth aluminum profile without rungs or handles. Without the mobile counterpart (the Lift or Easy) the tower is practically unclimbable.

  • Security without fences: Thanks to this system, unsightly barbed wire fences or massive anti-climb plates at the base of the masts were unnecessary. The towers integrate openly and safely into the cityscape.

cable c1 tower

2. Maintenance-free infrastructure for reliable operation

C1 stands for punctuality and reliability. The access system must not be a weak point here.

  • Longevity: The anodized HighStep Rail It is resistant to urban environmental influences and does not corrode.

  • Zero-maintenance: Since the rail contains no moving parts, it is 100% maintenance-free. This significantly reduces ongoing operating costs for the operator and fits perfectly with the concept of a sustainable, modern mobility solution.

  • Ergonomic access: Maintenance technicians use the portable HighStep LiftThis allows them to reach the roller batteries with minimal effort. This ensures the quality of the maintenance, as the technicians are not physically exhausted when they reach the top.


cable c1 paris

Summary: Key takeaways about intuitive eating

Cable C1 The Île-de-France region demonstrates how modern mobility reduces traffic congestion and creates quality of life. HighStep Systems It also provides the technological backbone for security: an access system that effectively keeps out unauthorized persons while simultaneously offering maintenance personnel the best possible workplace.

It is the perfect symbiosis of urban integration and technical excellence.

The integration of HighStep Systems The Câble C1 project marks a significant advancement for urban cable car infrastructure. In a densely populated area like the Val-de-Marne, where safety and aesthetics are paramount, conventional ladders are not an option. HighStep Systems This problem is elegantly solved: The smooth rail effectively prevents unauthorized climbing, thus protecting both residents and operators from accidents. At the same time, the portable lift ensures that maintenance teams can efficiently and ergonomically maintain the 4,5-kilometer-long route. This provides HighStep Systems an invisible but essential contribution to ensuring that the C1 can permanently fulfill its role as a reliable, congestion-free link in the Parisian transport network.

cable c1 tower 2

Projects

Revolutionary projects: Find out more about the groundbreaking applications and impressive projects in which our fall arrest systems brand plays a central role.

Protective equipment Fall protection

Gregor Wylenzek

Contact us

Contact us now and get free advice and get more information about our climbing systems.